Language:   

English French German Greek Italian Polish Spanish

Tel: +44 (0) 1646 698192





Sunday, 25th June 2017 7:00:15

Share

FacebookTwitterDiggDeliciousStumbleuponGoogle BookmarksTechnoratiLinkedinMixx

View our case studies

Client Login

 CONCOM Accredited

ISO Registered

The Stena Europe was found to have excessive wear in the lower housing bore for the bow thruster drive shaft during a dry dock inspection. The best solution would be to bore out the existing housing to accept a sleeve which, in turn, would have to be machined out to return the housing to its original dimensions - exactly.

The ships engineers also wished to check the angularity between the Drive Shaft and Bow Thruster Shaft, where the pinion gears mesh. M & A utilised one of its range of heavy duty line boring bars to replicate the position of the Bow Thruster Shaft. When the vertical bar had been set in the drive shaft housing bores, a sweep reading was taken across the horizontal bar. No error was found.

 

 View the full Case Study  ( PDF File Download - 175KB )

 

 

Global On-site Machining Services

 

We are serving the Petrochemical, Marine, Steel and General Industries with On-Site Machining, In-Situ Machining and Controlled Hydraulic Bolting services.

Our Customers

Our customers are some of the biggest in the world. We specialise in providing, and executing engineering solutions and on-site services designed to maintain the integrity of production and process plants. 

 

     

logo a and p
logo a and pb
logo a and pbold
logo bp
logo bpb
logo bpbold
logo conocophillips
logo conocophillipsb
logo conocophillipsbold
logo grimaldi
logo murphy oil
logo p and o
logo p and ob
logo p and obold
logo valero
logo valerob
logo valerobold
stenaline
stenalineb
stenalinebold
.

Total Peace Of Mind

 

Every member of the M & A Engineering team take responsibility to protect themselves, colleagues, customers and the community we impact. This ensures a safe and accident free work environment.